Detailed pre start information was provided, (which JDB issue to all clients regardless of project size) to include works programmes, construction phase plans, Risk and Method Statements (RAMS).
Before works commenced at the Marstons site all H & S measures were installed to include safety netting and edge protection. This involved working with the tenants, ensuring there was clear access for the safety netting team to navigate their way round the racking via Mewp.
Our quotations don’t just include the installation of the roof, we will project manage your refurbishment, coordinating structural engineers surveys and reports to ensure the integrity of the framework is up for the additional load of an overclad, instructing surveyors to carry out the prerequisite Refurbishment and Demolition asbestos survey, and then as standard, reassurance asbestos air monitoring throughout the duration of the project.