Within weeks of our proposal JDB were on site, after approval from our structural surveyor for the additional weight, JDB started the installation of edge protection scaffolding, safety netting and reassurance air tests by UKAS accredited lab technicians. Original rooflights were replaced prior to the new roof tier being installed, over Euroclass A1 insulation, followed with a plastisol coated steel sheets in Goosewing Grey.
The successful overcladding of Power Warehouse’s roof shows the transformative impact of strategic refurbishment initiatives. By addressing longstanding challenges, the project delivered tangible cost savings and operational efficiencies.